HONGYANG GROUP Niger Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Niger Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-G22 FUEL DISPENSER

D-G22

D-G22 FUEL DISPENSER

Pump Type :Optional

Inlet Pressure: >=54kPa.

Flow rate (L/min.): 55±5

Suction Distance (m): 6(verticalmente) / 50(orizzontalmente)

FlowMeter Type : Optional

Accuracy :±0.2%

Motor Voltage(V): 110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type : Solenold Vale Control Type

Preset: Function Provided(Small LCDIndicator)

Display(Counter): Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display Type: LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight : 235kg

Dimension(L×W×H): 900*620*2180(mm)

Dimension(L×W×H)Of Qty of Container :40ft: 45 20ft: 22

products links

links

technical archives

    l type fuel dispenser. Article I Failure judgment and troubleshooting Normal operation without fuel 1.1 If motor turn reversely, power phase would be wrong; if delivery V belt loose and rupture, regulating expansion wheel or replacing V wheel. 1.2 Vapor separator failure If triangular gasket of inlet and filter washer is loose or broken, air would flow into hydraulic system. To solve this kind of leakage is to tighten bolt or change a new washer. Serious jam in filter, including cone-shaped net, should clean waster or change a new filter net. If the check valve of vapor separator is clamped, resulting in no delivery, disconnect check valve and clean it, finally reassemble. Incorr fuel dispenser ect installation of floater or waster under sealed gasket in vapor separator, oil would be discharged from exhausting pipe. To clean waster and reassemble, change a new floater when find serious damage or not being homocentric. If small floater is leak or fall down, high pressure chamber can reach high pressure so that no delivery in fuel dispenser. Broken upper cover gasket also result in the communication between two chambers of high pressure and vapor separator so that no discharge out of fuel dispenser. 1.3. Pump trouble Substance clamped between valve core and valve seat in overflow valve result in oil circulate within pump. Taking out valve core and clean feculence, fix falling valve seat, changing pump when necessary. Due to high speed rotation some vane abrasion or damaged the inner pressure of pump is reduced la fuel dispenser rgely, even lost suction capacity. Replacing damaged vane after fuel dispenser cleaning feculence. Broken gasket or reverse installation in the surface between pump and vapor separator result in the communication of high and low pressure chambers so that no oil is discharged. Rotor and stator are loose, making pump axis run without loan. It is need to replace rotor or pump. Long operation increases the clearance between inner and outer gear, resulting large interior leakage and suction capacity declining

technical specification

    sponse is to be solved within the logic of the DeviceProxy   functionality.   Below the table of potential devices; the implementation of card process dialogues is easier in   case of combined devices eg.: PinEntryDeviceCardReader CashierTerminal Printer.   CashierDisplay A pop-up window (or a fixed window) on the POS cashier display dedicated to these   messages through the device proxy.   CustomerDisplay A temporary full access to the customer display at the POS or a pop-upfixed window in case   of w fuel dispenser ider graphical display. It depends on the POS technology.   Printer Stand-alone printer for receiptstickets.   ICCrw Integrated circuit card readerwriter. Stand alone.   CardReader Generic card reader combining magstripe reader and ICCrw.   PinEntryDeviceCardReader Generic card reader combined with a PinPad.   PinPad Keypad (e.g. for PIN enter) and customer display.(e.g. 16 2 chars or wider 4 lines graphical)   PEDReaderPrinter Generic card reader combined with a PinPad and ticket printer.   MSR Magnetic stripe reader stand alone.   RFID Wireless chip readerwriter for contact less cardstags.   fuel dispenser BarcodeScanner Barcode scanner (e.g. to re fuel dispenser ad barcode on a card or voucher coupons etc.)   CashierKeyboard Cashier input device (keyboard or touch screen)   CashierTerminal Cashier input device (keyboard or touch screen) and A pop-up window (or a fixed window) on   the POS cashier display dedicated to these messages through the device proxy.  

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    man Rights Watch, an NGO, urged him to enforce a ruling of the Constitutional Court that would increase punishments for paramilitaries who fail to disclose their crimes and give prosecutors more time to investigate them. But the government may not dare, for fear of goading the paramilitaries to regroup. El Tiempo, the country s biggest-circulation daily, reports that it intends to apply the most lenient possible interpretation of the law. Some people speculate that Mr Uribe, having weakened the FARC but failed to defeat it, may use his second term to open talks with the guerrillas. Opinion polls suggest that Colombians would favour a deal to swap jailed rebels for hostages held by the FAR fuel dispenser C. After four years of retreat the guerrillas would no doubt welcome a respite and a chance to publicise their revolutionary views, which negotiations would provide. The violence on July 31st may be the FARC s way of trying to improve its bargaining position ahead of talks. “The time is ripe,�says Eduardo Barajas, a political scientist. But neither side looks close to making the concessions required for a broad peace deal. Congress, which has a veto over Mr Uribe s economic agenda, will be a more pliant partner. He won his first term as an independent but fought his second having built a coalition of pro-Uribe parties, which now dominate the legislature. The alliance has drawn him into some unsavoury horse-trading, which he largely avoided in his first term. When Radical Change, an ally that thought it had been given to fuel dispenser o few government jobs, threatened to defect to the opposition, fuel dispenser Mr Uribe was obliged to woo it back by readmitting to the coalition congressmen who had been purged because of suspected links to paramilitary groups. That crisis overcome, Mr Uribe ought to have a stable legislative base of support, at least for a while. He will need it to enact his economic agenda, which is designed to help business. It includes an austere budget, the ratification of Colombia s free-trade agreement wit